Do you have any question about this error?
Message type: E = Error
Message class: I0 - Messages for PM tables
Message number: 240
Message text: WBS element &1 belongs to controlling area &2
The WBS element &V1& belongs to <DS:GLOS.controlling_area>controlling
area</> &V2&. However, the current technical object (for example the
<DS:GLOS.functional_location>functional location</> or the
<DS:GLOS.equipment>equipment</>) is in controlling area &V3&.
An activity allocation can only occur within the same controlling area.
INCLUDE 'KEINE-VERARBEITUNG' OBJECT DOKU ID TX LANGUAGE E
Assign a WBS element from controlling area &V3&.
Error message extract from SAP system. Copyright SAP SE.
I0240
- WBS element &1 belongs to controlling area &2 ?The SAP error message I0240 indicates that a Work Breakdown Structure (WBS) element is associated with a specific controlling area, and the operation you are trying to perform is not valid for that controlling area. This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project structures and their financial implications.
Cause:
The error occurs when:
- You are trying to assign or manipulate a WBS element that belongs to a different controlling area than the one currently being used in your transaction.
- There may be a mismatch between the controlling area of the WBS element and the controlling area of the cost center or internal order you are trying to associate it with.
Solution:
To resolve the I0240 error, you can take the following steps:
Check the Controlling Area:
- Verify the controlling area of the WBS element. You can do this by navigating to the WBS element in the project system and checking its attributes.
- Ensure that the controlling area you are working with in your transaction matches the controlling area of the WBS element.
Use the Correct Controlling Area:
- If you are working in a transaction that allows you to specify a controlling area, make sure to select the correct one that corresponds to the WBS element.
Reassign the WBS Element:
- If necessary, you may need to reassign the WBS element to the correct controlling area. This can be done through the project structure or by creating a new WBS element under the desired controlling area.
Consult with Your SAP Administrator:
- If you are unsure about the controlling areas or how to make changes, consult with your SAP administrator or a colleague who has experience with project systems in SAP.
Review Configuration:
- If this issue is recurring, it may be worth reviewing the configuration settings for controlling areas and project structures in your SAP system to ensure they are set up correctly.
Related Information:
CJ20N
(Project Builder) or CJ03
(Display WBS) to view and manage WBS elements.By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
I0239
The check revealed no errors or warnings for key date &
What causes this issue? You have called up the function <LS>Check object</>. As a result a range of consistency checks, that otherwise ar...
I0238
Cost center &1 belongs to company code &2
What causes this issue? The <DS:GLOS.cost_center>cost center</> &V1& that has been entered belongs on &V4& to <DS:GLOS...
I0241
WBS element &1 belongs to business area &2
What causes this issue? The WBS element &V1& that has been entered belongs to <DS:GLOS.business_area>business area</> &V2&...
I0242
WBS element &1 belongs to company code &2
What causes this issue? The WBS element &V1& that has been entered belongs to <DS:GLOS.company_code>company code</> &V2&....
Click on this link to search all SAP messages.