How To Fix HRTMC_RM011 - The scheduling end date must be after the start date


HRTMC_RM011 - Overview

  • Message type: E = Error

  • Message class: HRTMC_RM - Message Class for Talent Review Meeting

  • Message number: 011

  • Message text: The scheduling end date must be after the start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message HRTMC_RM011 - The scheduling end date must be after the start date ?
    The SAP error message HRTMC_RM011, which states "The scheduling end date must be after the start date," typically occurs in the context of time management or scheduling within the SAP system, particularly in modules related to Human Resources (HR) or Time Management.
    
    Cause: This error arises when a user attempts to create or modify a scheduling entry (such as a work schedule, time recording, or absence) where the end date is set to be earlier than or the same as the start date. This is logically incorrect because a scheduling period must have a defined duration, meaning the end date must always follow the start date.
    Solution: To resolve this error, follow these steps: Check Dates: Review the start and end dates you have entered. Ensure that the end date is indeed later than the start date. Correct the Entry: If you find that the end date is incorrect, modify it to a date that is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker