Do you have any question about this error?
Message type: E = Error
Message class: HRPFD00 - HR-PF: International Pension Fund
Message number: 102
Message text: Value type &1 is already used in processing schedule
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
HRPFD00102
- Value type &1 is already used in processing schedule ?The SAP error message HRPFD00102 indicates that a value type (e.g., a specific type of data or parameter) is already being used in a processing schedule. This typically occurs in the context of HR (Human Resources) or payroll processing when there is an attempt to assign a value type that has already been utilized in the same processing schedule.
Cause:
- Duplicate Assignment: The value type you are trying to assign is already assigned to another operation or calculation within the same processing schedule.
- Configuration Issues: There may be a misconfiguration in the payroll schema or processing schedule that allows for duplicate value types.
- Incorrect Data Entry: The user may have inadvertently entered the same value type multiple times.
Solution:
- Check Processing Schedule: Review the processing schedule to identify where the value type is already being used. Ensure that each value type is unique within the context of the processing schedule.
- Modify the Schema: If the value type is necessary for multiple operations, consider modifying the payroll schema to accommodate this without causing conflicts. This may involve changing the sequence of operations or using different value types.
- Remove Duplicate Entries: If you find that the value type is indeed duplicated, remove or adjust the duplicate entry to resolve the conflict.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on managing value types within payroll processing.
- Testing: After making changes, test the processing schedule to ensure that the error does not recur and that the payroll calculations are accurate.
Related Information:
If the issue persists after following these steps, it may be beneficial to consult with an SAP HR consultant or your internal SAP support team for further assistance.
Get instant SAP help. Start your 7-day free trial now.
HRPFD00101
Selected processing step does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPFD00100
*** 100 - 199: Reserved for editor
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPFD00103
Value type &1 does not exist yet
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
HRPFD00104
Method &1 is already used for value type &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.