Message type: E = Error
Message class: HRPAYDEBAV - HR-BAV (CPS) Error Messages (Germany)
Message number: 072
Message text: Control of attributable time is missing for & & for date &
The control of the attributable period for the increase basis
(according to calculation method) &V1& for valuation basis &V2& is
missing on &V3&
. The attributable period cannot be calculated.
In the standard system, the attributable period can currently have the
following increase bases:
01: Increase basis time
02: Increase basis money
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Maintain the control entry for the attributable period in table T5DC4.
Error message extract from SAP system. Copyright SAP SE.
HRPAYDEBAV072
- Control of attributable time is missing for & & for date & ?The SAP error message HRPAYDEBAV072 indicates that there is a missing control of attributable time for a specific employee and date. This error typically arises in the context of payroll processing, particularly in the German payroll module (HR-PAY-DE).
Cause: The error usually occurs due to one of the following reasons: Missing Time Management Data: The employee may not have the necessary time management data (e.g., attendance, absence, or other time-related information) recorded in the system for the specified date. Incorrect Configuration: There may be a configuration issue in the time management settings or payroll schema that prevents the system from processing the attributable time correctly. Missing Control Records: Control records for the employee's time management may not be set up correctly, leading to the inability to attribute time for payroll calculations.
Solution: To resolve the error, you can take the following steps: Check Employee Time Data: Go to the employee's time management records and verify if the necessary attendance
Get instant SAP help. Sign up for our Free Essentials Plan.
HRPAYDEBAV071
Adjustment has not been created for pension group & & on &
What causes this issue? The control entry for the pension adjustment for pension plan &V1& &V2& does not exist on &V3&. This ...
HRPAYDEBAV070
Increase control missing for & & & on date &
What causes this issue? The increase control for the increase basis &V1& (according to calculation method) for valuation basis &V2& a...
HRPAYDEBAV073
Invalid increase type & (neither increase nor attibution time)
What causes this issue? The pension calculation program recognizes the 'normal' increase and the attributable period as the increase. The c...
HRPAYDEBAV074
No subsequent status after VE check for entitlement & & on &
What causes this issue? The vesting is checked for entitlement &V1&. After the check, the entitlement period has a new entitlement status. Th...
Click on this link to search all SAP messages.