How To Fix HRHCP00_PLAN101 - Cost planning run &1 is locked


HRHCP00_PLAN101 - Overview

  • Message type: E = Error

  • Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan

  • Message number: 101

  • Message text: Cost planning run &1 is locked

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message HRHCP00_PLAN101 - Cost planning run &1 is locked ?
    The SAP error message "HRHCP00_PLAN101 Cost planning run &1 is locked" typically indicates that a cost planning run is currently locked, preventing other processes from accessing or modifying it. This can occur in various SAP modules, particularly in Human Capital Management (HCM) when dealing with cost planning for personnel.
    
    Cause: Concurrent Processes: Another user or process is currently executing a cost planning run, which locks the planning run for others. Incomplete Previous Run: A previous cost planning run may not have completed successfully, leaving the system in a locked state. System Configuration: There may be configuration settings that enforce locking mechanisms during cost planning runs.
    Solution: Check for Active Processes: Use transaction codes like SM66 (Global Work Process Overview) or SM50 (Work Process Overview) to check if another user or process is currently running the cost planning. If you identify a long-running process, you may need to wait for it to complete or consult with the user running

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant