Message type: E = Error
Message class: HRHCP00_PLAN - Messages About Personnel Cost Plan
Message number: 057
Message text: Internal error: planning run does not contain entry for object &1 &2
In the cluster, the assignment information for the cost object &V1&
&V2& is missing. This data inconsistency was caused by a program error.
Therefore you cannot perform the action.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
HRHCP00_PLAN057
- Internal error: planning run does not contain entry for object &1 &2 ?The SAP error message HRHCP00_PLAN057 indicates that there is an internal error during a planning run, specifically stating that the planning run does not contain an entry for the specified object (denoted by &1 and &2). This error typically occurs in the context of Human Capital Management (HCM) and can be related to various planning activities, such as workforce planning or personnel planning. Causes: Missing Data: The specified object (e.g., a position, employee, or organizational unit) may not have been included in the planning run due to missing or incomplete data.
Configuration Issues: There may be configuration issues in the planning settings that prevent the system from recognizing the object. Authorization Issues: The user executing the planning run may not have the necessary authorizations to access the specified object. Technical Issues: There could be a technical issue or bug in the SAP system that is causing the planning run to fail. Solutions: Check Object Existence: Verify that
Get instant SAP help. Sign up for our Free Essentials Plan.
HRHCP00_PLAN056
Error while checking format
What causes this issue? The SAP system could not perform the entry check for the correct field format for field &V1& on entry screen &V2&...
HRHCP00_PLAN055
Error while reading planning results from cluster PCL5
What causes this issue? You tried to read planning results with the key &V1& from the cluster PCL5. This read operation leads to a database e...
HRHCP00_PLAN058
The Web browser for detail planning was not started
What causes this issue? You tried to start the Web application for detail planning with the URL &V1&. The SAP system could not start the Web ...
HRHCP00_PLAN059
Database error while reading job texts
What causes this issue? You tried to read job texts for the plan version &V1& and the period &V2& to &V3&. While this was hap...
Click on this link to search all SAP messages.