How To Fix HRECM00BDG085 - Unable to change status; budget is already in planning


HRECM00BDG085 - Overview

  • Message type: E = Error

  • Message class: HRECM00BDG - Messages for Budgeting Functions

  • Message number: 085

  • Message text: Unable to change status; budget is already in planning

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


HRECM00BDG085 - Details

  • The SAP error message HRECM00BDG085 indicates that there is an issue with changing the status of a budget because it is already in the planning phase. This typically occurs in the context of budget management within SAP, particularly in modules related to Human Resources or Financial Planning.
    
    Cause: Budget Status: The budget you are trying to modify is currently set to a status that does not allow changes. This often happens when the budget is locked for changes because it is in the planning phase. Authorization Issues: The user may not have the necessary authorizations to change the budget status. System Configuration: There may be specific configurations in the system that prevent changes to budgets that are already in the planning phase.
    Solution: Check Budget Status: Verify the current status of the budget. If it is indeed in the planning phase, you may need to wait until it is released or unlocked for changes. Authorization Check: Ensure

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


HRECM00BDG085 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker