How To Fix HRECM00BDG062 - Stock unit mismatch between &1 and &2; unable to assign budget &3


HRECM00BDG062 - Overview

  • Message type: E = Error

  • Message class: HRECM00BDG - Messages for Budgeting Functions

  • Message number: 062

  • Message text: Stock unit mismatch between &1 and &2; unable to assign budget &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


HRECM00BDG062 - Details

  • The SAP error message HRECM00BDG062 indicates a stock unit mismatch between two entities (typically between a budget and a cost center or a project) in the context of budget assignment. This error usually arises when there is a discrepancy in the units of measure or the stock units used in the budget assignment process.
    
    Cause: Unit of Measure Mismatch: The most common cause is that the units of measure for the budget and the target (e.g., cost center, project) do not match. For example, if the budget is defined in one unit (e.g., hours) and the target is defined in another (e.g., days), the system will not allow the assignment.
    Configuration Issues: There may be configuration issues in the SAP system regarding how budgets and stock units are defined and managed. Data Entry Errors: Incorrect data entry during the budget creation or assignment process can lead to mismatches. Master Data Issues: The master data for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


HRECM00BDG062 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author