Message type: E = Error
Message class: HRBEN00FMODULES - Error Messages for Benefits - Function Modules
Message number: 050
Message text: Enter currency for credit override for plan &
You tried to enter an alternative credit amount for the plan &V1&
without specifying a currency for this amount.
Enter a currency for the alternative credit amount.
Error message extract from SAP system. Copyright SAP SE.
HRBEN00FMODULES050
- Enter currency for credit override for plan & ?The SAP error message HRBEN00FMODULES050 typically occurs in the context of the Benefits Administration module within SAP HR (Human Resources). This error indicates that a currency has not been entered for a credit override for a specific benefits plan. Here’s a breakdown of the cause, potential solutions, and related information:
Cause: Missing Currency Entry: The error arises when a user attempts to process a benefits plan that requires a currency specification for a credit override, but the currency field is left blank.
Configuration Issues: There may be issues in the configuration of the benefits plan that require a currency to be defined but are not set up correctly. Data Entry Error: It could also be a simple oversight where the user forgot to enter the currency.
Solution: Enter Currency: Navigate to the relevant transaction or screen where the error occurred. Locate the field for entering the currency for the credit override. Enter the appropriate currency code (e.g., USD,
Get instant SAP help. Sign up for our Free Essentials Plan.
HRBEN00FMODULES049
Number of post-tax contribution units for plan & must lie between & and &
What causes this issue? You tried to enter a number of post-tax contribution units that does not lie within the range of values allowed by the plan p...
HRBEN00FMODULES048
Number of pre-tax contribution units for plan & must lie between & and &
What causes this issue? You tried to enter a number of pre-tax contribution units that does not lie within the range of values allowed by the plan po...
HRBEN00FMODULES051
Enter period for cost override for plan &
What causes this issue? You tried to enter an alternative cost amount for the plan &V1& without specifying a period for which this amount sho...
HRBEN00FMODULES052
Enter currency for cost override for plan &
What causes this issue? You tried to enter an alternative cost amount for the plan &V1& without specifying a currency for this amount.How to ...
Click on this link to search all SAP messages.