How To Fix GRPG038 - Pegging has already been carried out


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GRPG - Grouping/Pegging for Individual Project Planning

  • Message number: 038

  • Message text: Pegging has already been carried out

  • Show details Hide details
  • What causes this issue?

    Pegging is already being carried out by user &v2& for individual
    project planning segment &v1&.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GRPG038 - Pegging has already been carried out ?

    The SAP error message GRPG038, which states "Pegging has already been carried out," typically occurs in the context of production planning and inventory management. This error indicates that the system has already established a pegging relationship for the material in question, meaning that the system has already linked the demand for a material to a specific supply source.

    Cause:

    1. Pegging Already Exists: The primary cause of this error is that the pegging process has already been executed for the material, and the system does not allow for multiple pegging entries for the same demand and supply relationship.
    2. Incorrect Process Flow: The error may also arise if the user attempts to re-peg materials without first clearing the existing pegging relationships.
    3. System Configuration: In some cases, the configuration settings in SAP may restrict the ability to change pegging relationships once they have been established.

    Solution:

    1. Check Existing Pegging: Use transaction codes like MD04 (Stock/Requirements List) or MD05 (Individual Display of MRP List) to check the existing pegging relationships for the material. This will help you understand what has already been pegged.
    2. Clear Existing Pegging: If you need to change the pegging, you may need to clear the existing pegging relationships. This can typically be done through the appropriate transaction (e.g., using transaction code COHV for mass processing of production orders).
    3. Re-evaluate Demand and Supply: Ensure that the demand and supply situation has been correctly assessed. If there are changes in demand or supply, you may need to adjust the planning parameters or re-run the MRP (Material Requirements Planning) process.
    4. Consult Documentation: Review SAP documentation or consult with your SAP support team for specific instructions on how to handle pegging in your version of SAP, as processes may vary.

    Related Information:

    • Pegging in SAP: Pegging is a critical function in SAP that helps in tracking the source of demand for materials. It is particularly important in environments with complex supply chains and production processes.
    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MD04, MD05, COHV, and others that can help you manage and analyze pegging relationships.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide additional insights or patches that could resolve the issue.
    • User Roles and Permissions: Ensure that you have the necessary permissions to view and modify pegging relationships, as restrictions may lead to errors.

    If the issue persists after following these steps, it may be beneficial to engage with your SAP support team or consult with an SAP expert for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author