Message type: E = Error
Message class: GPSC - PSC Application
Message number: 521
Message text: The PSC & has no operator or government defined
During the calculation process the program needs the partner defines as
operator and the partner defined as government. This assignment was not
found.
The program has to be terminated
Please check the PSC master data. It has two fields where the
government and the operator can be defined. The reason that those
fields are needed is in the reporting ledgers.
Since the contractor share is split by partner, it is necessary to
post the operator share also with a partner information. Same is true
for the government share. therwise both postings would have partner
blank and would be collected to one line on summary level.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GPSC521
- The PSC & has no operator or government defined ?The SAP error message GPSC521 indicates that the Product Supply Chain (PSC) does not have an operator or government defined. This error typically arises in the context of supply chain management, particularly when dealing with product supply chains that require specific operators or government entities for processing.
Cause:
- Missing Configuration: The PSC may not have been properly configured in the system, leading to the absence of an operator or government entity.
- Data Entry Error: There may have been an oversight during data entry, where the operator or government information was not filled in.
- Master Data Issues: The master data related to the PSC might be incomplete or incorrect, which can lead to this error.
- System Updates: If there have been recent updates or changes to the system, it might have affected the existing configurations.
Solution:
- Check Configuration: Verify the configuration settings for the PSC in the SAP system. Ensure that the operator and government fields are correctly defined.
- Update Master Data: If the operator or government information is missing, update the relevant master data records to include this information.
- Data Validation: Review the data entry processes to ensure that all required fields are being filled out correctly.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on configuring PSCs and resolving related errors.
- Contact Support: If the issue persists, consider reaching out to SAP support or your internal IT team for further assistance.
Related Information:
SPRO
for configuration settings.By addressing the configuration and data entry aspects, you should be able to resolve the GPSC521 error effectively.
Get instant SAP help. Start your 7-day free trial now.
GPSC520
PSC definition was not found for PSC &
What causes this issue? During the calculation Process, the PSC master data has to be read. But there was no data foundSystem Response The program ...
GPSC516
Not all PSC/products for the combined product & are selected
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GPSC522
PSC &, Product &, Calc.Type &, CostType &: Equity Group Problem
What causes this issue? The PSC is flagged as "No Equity Group" but in the calculation scheme not all lines have an equity group assignedSy...
GPSC523
PSC &: Equity Group & from the Calc Scheme is not defined
What causes this issue? In the Calculation Scheme Assignment is an Equity Group entered which does not exist within the PSA definition,,System Respon...