Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix GPSC202 - The field movements for the PSC rollup do not exist.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GPSC - PSC Application

  • Message number: 202

  • Message text: The field movements for the PSC rollup do not exist.

  • Show details Hide details
  • The delivered field movements 4PSA and 4PSC for the PSC rollup do not
    exist.
    Please check if you are in the correct client and that the transport of
    the PSC was done.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GPSC202 - The field movements for the PSC rollup do not exist. ?

    The SAP error message GPSC202, which states "The field movements for the PSC rollup do not exist," typically occurs in the context of Project System (PS) or related modules when there is an attempt to perform a rollup of costs or other data, but the necessary field movements (data entries) are not available for the specified period or project.

    Causes:

    1. Missing Data: The most common cause is that there are no actual costs or planned costs recorded for the project or WBS (Work Breakdown Structure) element for the specified period.
    2. Incorrect Period: The rollup might be attempted for a period where no transactions have been posted.
    3. Configuration Issues: There may be configuration issues in the system that prevent the rollup from accessing the necessary data.
    4. Authorization Issues: Lack of proper authorizations to view or process the data can also lead to this error.
    5. Data Consistency: There might be inconsistencies in the data, such as missing or incomplete entries in the relevant tables.

    Solutions:

    1. Check Data Entries: Verify that there are actual or planned costs recorded for the project or WBS element in the relevant period. You can do this by checking the project’s cost reports or transaction logs.
    2. Review Rollup Period: Ensure that the rollup is being executed for a period where data exists. If necessary, adjust the period for the rollup.
    3. Configuration Review: Check the configuration settings in the Project System to ensure that everything is set up correctly for rollups. This may involve consulting with a functional consultant or SAP support.
    4. Authorization Check: Ensure that the user executing the rollup has the necessary authorizations to access the data.
    5. Data Consistency Check: Run consistency checks on the project data to identify and rectify any inconsistencies. This may involve using transaction codes like CJEN (for project structure) or CJE1 (for project actual data).
    6. Consult Documentation: Refer to SAP documentation or notes related to the specific error message for additional troubleshooting steps or patches.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJI3 (Actual Line Items), and CJ88 (Settlement) to analyze project data.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Support: If the issue persists after trying the above solutions, consider reaching out to SAP support or your internal SAP support team for further assistance.

    By following these steps, you should be able to identify the root cause of the GPSC202 error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker