How To Fix GPSC064 - Contractor can not be used for PSC marked as 'Not Equity Group PSC'


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GPSC - PSC Application

  • Message number: 064

  • Message text: Contractor can not be used for PSC marked as 'Not Equity Group PSC'

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GPSC064 - Contractor can not be used for PSC marked as 'Not Equity Group PSC' ?

    The SAP error message GPSC064 indicates that there is an issue with the contractor assignment in relation to a PSC (Project Service Contract) that is marked as 'Not Equity Group PSC'. This error typically arises in the context of project management and procurement processes within SAP, particularly in industries such as oil and gas, construction, or any sector that utilizes project service contracts.

    Cause:

    1. Contractor Assignment: The contractor you are trying to assign to the PSC is not eligible because the PSC is marked as 'Not Equity Group PSC'. This means that the contractor does not belong to the required group or category that is allowed for this specific type of PSC.
    2. Configuration Settings: There may be configuration settings in the SAP system that restrict the use of certain contractors based on the type of PSC.
    3. Data Integrity Issues: There could be inconsistencies or missing data in the contractor or PSC master data that lead to this error.

    Solution:

    1. Check Contractor Eligibility: Verify if the contractor you are trying to assign is indeed eligible for the PSC. You may need to consult with your procurement or project management team to ensure that the contractor is part of the correct group.
    2. Review PSC Settings: Check the settings of the PSC in question. Ensure that it is correctly configured and that the 'Not Equity Group PSC' designation is appropriate for the project.
    3. Modify Contractor Group: If necessary, consider changing the contractor's group or category to align with the requirements of the PSC. This may involve updating the contractor's master data in the SAP system.
    4. Consult Documentation: Review any relevant documentation or guidelines related to contractor assignments and PSCs within your organization to ensure compliance with internal policies.
    5. Contact SAP Support: If the issue persists and you cannot identify the cause, consider reaching out to SAP support or your internal IT team for further assistance.

    Related Information:

    • Master Data Management: Ensure that both contractor and PSC master data are properly maintained and updated in the SAP system.
    • User Roles and Authorizations: Check if the user has the necessary permissions to assign contractors to PSCs.
    • Training and Guidelines: Ensure that users involved in project management and procurement are trained on the correct processes and understand the implications of PSC classifications.

    By addressing these areas, you should be able to resolve the GPSC064 error and successfully assign the contractor to the appropriate PSC.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker