Do you have any question about this error?
Message type: E = Error
Message class: GPSC - PSC Application
Message number: 011
Message text: Enter valid period
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GPSC011
- Enter valid period ?The SAP error message GPSC011 "Enter valid period" typically occurs in the context of planning or scheduling activities within the SAP system, particularly in modules related to production planning, project system, or similar areas where time periods are critical.
Cause:
- Invalid Date Range: The user may have entered a start and end date that do not form a valid range (e.g., the end date is earlier than the start date).
- Closed Period: The period you are trying to enter may be closed for posting or planning, meaning that no further entries can be made for that time frame.
- Incorrect Format: The date format may not match the expected format in the system settings, leading to the system not recognizing the input as valid.
- Missing Configuration: The system may not be configured to allow entries for the specified period due to settings in the controlling area or fiscal year variant.
Solution:
- Check Date Range: Ensure that the start date is earlier than the end date. Adjust the dates accordingly.
- Open Periods: Verify if the period you are trying to enter is open for posting. You may need to consult with your SAP administrator or finance team to open the period if necessary.
- Correct Format: Ensure that the date is entered in the correct format as per your system's configuration (e.g., DD/MM/YYYY or MM/DD/YYYY).
- Configuration Review: If the issue persists, review the configuration settings related to the fiscal year and periods in the relevant modules. This may involve checking the controlling area settings or the project system settings.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines related to the module you are working in.
Related Information:
By following these steps, you should be able to identify the cause of the GPSC011 error and implement a solution.
Get instant SAP help. Start your 7-day free trial now.
GPSC010
Enter quantity from less than quantity to
What causes this issue? The value you entered for "quantity from" is greater than the value of the "quantity to" field.System Res...
GPSC009
Only one Producing Unit is allowed within a single PSC Group
A maximum of one producing unit should exist within a PSC group. You have entered multiple producing units, which may span the same period. Please v...
GPSC012
The Calc Scheme UOM does not match the Product UOM
What causes this issue? UoM used in Calculation Scheme does not much the one in PSC Product master tableSystem Response The system issues an error m...
GPSC013
Please enter a PSC Calc type & (costs) or & (other costs)
What causes this issue? Calculation Type entered does not belong to Cost or Other Cost categoriesSystem Response The system issues an error message ...
Click on this link to search all SAP messages.