Message type: E = Error
Message class: GPD - Pegging & Distribution
Message number: 077
Message text: Assembly &, order & has lower or same planning level as material &
Assignment of order &V2& is based on the historical assignments of
material &V1&. The pegging process depends on the planning level of the
material. For example, materials with planning level '000' are
processed first, then those with planning level '001', and so on.
Check the assignment of order &V2&. If assignment of the higher level
order has changed, this will be reflected in the lower level order only
after the next pegging run. If the higher level order does not have any
historical assignments, order &V2& can only be assigned in the next
program run.
Check assignment of order &V2&.
Error message extract from SAP system. Copyright SAP SE.
GPD077
- Assembly &, order & has lower or same planning level as material & ?The SAP error message GPD077 indicates that there is a planning level issue with the assembly and the order in question. Specifically, it means that the assembly (or product) and the order have the same or a lower planning level than the material being processed. This can occur in scenarios involving production planning, where the system expects a certain hierarchy or relationship between the assembly, order, and material.
Cause:
- Planning Levels: In SAP, planning levels are used to define the hierarchy of materials and assemblies. If an assembly is planned at a higher level than the material, the system expects the order to also be at a higher planning level.
- Incorrect Configuration: The configuration of the material master or the production order may not align with the expected planning levels.
- Master Data Issues: There may be inconsistencies in the master data for the materials, assemblies, or orders involved.
Solution:
- Check Planning Levels: Review the planning levels of the assembly, order, and material. Ensure that the assembly and order are at the correct planning levels relative to the material.
- Adjust Master Data: If necessary, adjust the master data for the materials and assemblies to ensure they are correctly configured. This may involve changing the planning strategy or the production version.
- Review Production Orders: Check the production order settings to ensure they are correctly set up to match the planning levels of the assembly and material.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on planning levels and how they should be configured in your system.
- Contact SAP Support: If the issue persists, consider reaching out to SAP support for assistance, especially if it involves complex configurations or customizations.
Related Information:
MD04
(Stock/Requirements List) or CO03
(Display Production Order) to analyze the situation further.MM03
to verify the planning levels and other relevant settings.By following these steps, you should be able to identify the root cause of the GPD077 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GPD076
Refurbishment order &: Assignment based on history of order &
What causes this issue? Assignment of refurbishment order &V1& is based on the history of order &V2&. Order &V1& was triggere...
GPD075
Replenishment object &1 could not be fully assigned
What causes this issue? Object &V1& could not be fully assigned.System Response Processing continues, however the object is not considered d...
GPD078
Refurbishment order &: No history, assignment not possible
What causes this issue? It is not possible to assign refurbishment order &V1&. Order &V1& has been triggered by an order reservation,...
GPD079
Requirements grouping: Function not possible after goods receipt
What causes this issue? You have already posted a goods receipt for the production order and you now want to change the account assignment WBS elemen...
Click on this link to search all SAP messages.