How To Fix GPD051 - Inconsistency: grouping WBS element &, material &, batch &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GPD - Pegging & Distribution

  • Message number: 051

  • Message text: Inconsistency: grouping WBS element &, material &, batch &

  • Show details Hide details
  • What causes this issue?

    Goods movement affects a WBS element for which grouping is active. A
    distribution profile is created in the WBS element's master data. This
    means the goods movement is relevant for the pegging and distribution
    process.
    The system has found an inconsistency between tables MSPR and PEG_TSTK.
    This may be due to the following:
    Program error.
    Movement type is incorrectly defined in Customizing and has been marked
    as not relevent for the pegging and distribution process.

    System Response

    Processing stops. The material document cannot be posted.

    How to fix this error?

    Check the <DS:TRAN.0PEG02>allowed movement types</> for the pegging and
    distribution process. If necessary, inform your system administrator.

    Procedure for System Administrators

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GPD051 - Inconsistency: grouping WBS element &, material &, batch & ?

    The SAP error message GPD051 indicates an inconsistency related to a grouping of a Work Breakdown Structure (WBS) element, material, and batch. This error typically arises in the context of project management and material management within SAP, particularly when dealing with project-related procurement or inventory management.

    Cause:

    The error can be caused by several factors, including:

    1. Data Inconsistency: There may be inconsistencies in the data related to the WBS element, material, or batch. This could be due to incorrect entries or missing data in the relevant master records.

    2. Batch Management Issues: If batch management is enabled for the material, there may be issues with the batch assignment or the batch itself may not be properly linked to the WBS element.

    3. Project Structure Issues: The WBS element may not be correctly structured or may not have the necessary authorizations or settings to allow for the grouping with the specified material and batch.

    4. Configuration Issues: There may be configuration settings in the system that are not aligned with the requirements for the project or material management processes.

    Solution:

    To resolve the GPD051 error, you can take the following steps:

    1. Check Data Consistency:

      • Verify the WBS element, material, and batch details in the system. Ensure that all relevant data is correctly entered and consistent across the different master records.
      • Use transaction codes like CJ20N (Project Builder) to check the WBS element and MM03 (Material Master) to review the material details.
    2. Review Batch Management:

      • If batch management is enabled, ensure that the batch is correctly assigned to the material and that it is available for use in the project.
      • Check the batch status and ensure it is not restricted or inactive.
    3. Examine Project Structure:

      • Ensure that the WBS element is correctly structured and that it has the necessary settings for procurement and inventory management.
      • Check for any missing authorizations or settings that may prevent the grouping from being valid.
    4. Configuration Review:

      • Review the configuration settings related to project management and material management in the SAP system. Ensure that they are set up correctly to support the processes you are trying to execute.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on the error message and related processes.
    6. Seek Support:

      • If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert who can provide more tailored assistance based on your specific system configuration and business processes.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N for project management, MM03 for material master data, and MB1A for goods movements.
    • SAP Notes: Check for any SAP Notes related to error GPD051 in the SAP Support Portal, as there may be specific patches or updates that address known issues.
    • Training and Documentation: Ensure that users involved in project management and material handling are adequately trained on the processes and data requirements to minimize the occurrence of such errors.

    By following these steps, you should be able to identify and resolve the inconsistency causing the GPD051 error in your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant