How To Fix GL548 - Error when calculating the target costs for cost center &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GL - FI-SL Rollup

  • Message number: 548

  • Message text: Error when calculating the target costs for cost center &

  • Show details Hide details
  • What causes this issue?

    An error occurred during the calculation of the actual costs.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Inform your system administrator.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GL548 - Error when calculating the target costs for cost center & ?

    The SAP error message GL548 typically indicates an issue with calculating target costs for a cost center. This error can arise due to various reasons, including configuration issues, missing data, or inconsistencies in the cost center settings. Here’s a breakdown of the potential causes, solutions, and related information:

    Causes of GL548 Error

    1. Missing Master Data: The cost center may not have the necessary master data set up, such as valid cost elements or activity types.

    2. Incorrect Configuration: The configuration settings for the cost center or the controlling area may not be set up correctly, leading to issues in cost calculation.

    3. Inconsistent Data: There may be inconsistencies in the data related to the cost center, such as incorrect assignment of cost elements or activity types.

    4. Period Lock: The period for which the target costs are being calculated may be locked, preventing any changes or calculations.

    5. Missing Planning Data: If there is no planning data available for the cost center, the system may not be able to calculate target costs.

    Solutions to GL548 Error

    1. Check Master Data: Ensure that all necessary master data for the cost center is correctly set up. This includes verifying that cost elements and activity types are properly assigned.

    2. Review Configuration: Go through the configuration settings for the cost center and controlling area. Make sure that all settings align with the requirements for target cost calculation.

    3. Data Consistency Check: Perform a consistency check on the data related to the cost center. Look for any discrepancies or missing assignments that could affect cost calculations.

    4. Unlock Period: If the period is locked, consult with your finance team to unlock it if necessary, or check if the calculations can be performed in a different period.

    5. Input Planning Data: If planning data is missing, input the necessary planning data for the cost center to enable target cost calculations.

    6. Consult SAP Notes: Check for any relevant SAP Notes that may address this specific error. SAP frequently releases updates and patches that can resolve known issues.

    Related Information

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as KP06 (Cost Center Planning) and KSB1 (Cost Centers: Actual Line Items) to analyze and manage cost center data.

    • Documentation: Refer to SAP documentation for detailed information on cost center accounting and target cost calculations.

    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP team for further assistance.

    By following these steps, you should be able to identify the root cause of the GL548 error and implement the necessary solutions to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker