Do you have any question about this error?
Message type: E = Error
Message class: GJ - Joint Venture Accounting
Message number: 632
Message text: Equity Group Does not Exist for Project.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GJ632
- Equity Group Does not Exist for Project. ?The SAP error message GJ632 ("Equity Group Does not Exist for Project") typically occurs in the context of Project System (PS) and is related to the management of equity groups in the project. This error indicates that the system cannot find a valid equity group associated with the project you are trying to work with.
Cause:
- Missing Equity Group: The equity group that is supposed to be linked to the project does not exist in the system.
- Incorrect Project Settings: The project may not have been set up correctly, or the equity group was not assigned during project creation.
- Configuration Issues: There may be issues with the configuration settings in the system that prevent the equity group from being recognized.
- Authorization Issues: The user may not have the necessary authorizations to view or access the equity group.
Solution:
Check Equity Group Configuration:
- Go to the configuration settings in SAP and verify that the equity group is defined correctly.
- Use transaction code
OIJG
(or the relevant transaction for your version) to check the equity group settings.Assign Equity Group to Project:
- If the equity group is missing, you may need to create it or assign an existing equity group to the project.
- Use transaction code
CJ20N
to access the project and check the settings. Ensure that the equity group is assigned correctly.Review Project Settings:
- Ensure that all necessary fields are filled out correctly in the project definition.
- Check if the project is in the correct status and that all prerequisites are met.
Authorization Check:
- Ensure that the user has the necessary authorizations to access the equity group and the project.
- Consult with your SAP security team if you suspect authorization issues.
Consult Documentation:
- Review SAP documentation or help files related to Project System and equity groups for additional guidance.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
CJ20N
(Project Builder), OIJG
(Equity Group Configuration), and CJ01
(Create Work Breakdown Structure).By following these steps, you should be able to identify and resolve the cause of the GJ632 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
GJ631
Equity Group & Is Invalid for Effective Date &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GJ630
No Valid Equity Group Found for Project & Date &
What causes this issue? No equity group was found on T8JG for the effective date.System Response Cash call is blocked.How to fix this error? Modify...
GJ633
Equity group & does not exist for venture & in company code &
What causes this issue? The entered equity group does not exist for the entered company code and venture.System Response Processing cannot continue ...
GJ634
Equity Group & Is Inactive for Project &
What causes this issue? System Response A cash call cannot be performed on an inactive equity group.How to fix this error? Verify that the equity gr...
Click on this link to search all SAP messages.