How To Fix GJ025 - Inception-To Date is only Defined for the Test System


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GJ - Joint Venture Accounting

  • Message number: 025

  • Message text: Inception-To Date is only Defined for the Test System

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    This functionality has not yet been released by SAP AG for productive
    systems.

    How to fix this error?


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GJ025 - Inception-To Date is only Defined for the Test System ?

    The SAP error message GJ025, which states "Inception-To-Date is only defined for the test system," typically occurs in the context of SAP's Joint Venture Accounting (JVA) module. This error indicates that the Inception-To-Date (ITD) value has not been properly configured for the production environment, and it is only set up in the test system.

    Cause:

    1. Configuration Issue: The Inception-To-Date (ITD) is a critical parameter in JVA that defines the starting point for financial calculations. If it is only defined in the test system and not in the production system, this error will occur.
    2. System Environment: The error suggests that the system you are working in is not set up correctly for production use, possibly due to incomplete configuration or migration from a test environment.

    Solution:

    1. Check Configuration:

      • Go to the JVA configuration settings in the production system.
      • Ensure that the Inception-To-Date is defined correctly. This can usually be found in the JVA customizing settings under the relevant configuration path.
    2. Define Inception-To-Date:

      • If it is not defined, you will need to set the Inception-To-Date in the production system. This typically involves specifying the date from which the joint venture accounting should start calculating.
      • You may need to consult with your SAP Basis or JVA functional consultant to ensure that this is done correctly.
    3. Transport Configuration:

      • If the configuration was done in the test system, consider transporting the relevant configuration settings from the test system to the production system using the SAP transport management system.
    4. Testing:

      • After making the necessary changes, perform tests to ensure that the error no longer appears and that the system behaves as expected.

    Related Information:

    • Documentation: Refer to SAP Help documentation for Joint Venture Accounting for detailed steps on configuring Inception-To-Date.
    • SAP Notes: Check for any relevant SAP Notes that might address this specific error or provide additional guidance.
    • Support: If the issue persists, consider reaching out to SAP support or your internal SAP support team for further assistance.

    By following these steps, you should be able to resolve the GJ025 error and ensure that your JVA configuration is correctly set up in the production environment.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author