How To Fix GI241 - Transfer of planning data with over 53 periods not currently supported


GI241 - Overview

  • Message type: E = Error

  • Message class: GI - FI-SL update

  • Message number: 241

  • Message text: Transfer of planning data with over 53 periods not currently supported

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GI241 - Transfer of planning data with over 53 periods not currently supported ?
    The SAP error message GI241, which states "Transfer of planning data with over 53 periods not currently supported," typically occurs in the context of planning and forecasting within SAP systems, particularly when using the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules.
    
    Cause: The error arises when a planning run or data transfer is attempted with a time horizon that exceeds the maximum number of periods allowed for a single planning run. In many SAP systems, the limit is set to 53 periods (which could represent weeks, months, or any other time unit depending on the configuration). This limitation is often due to the underlying data model or the configuration settings in the planning application.
    Solution: To resolve this error, you can consider the following approaches: Reduce the Number of Periods: Adjust your planning run to include 53 periods or fewer. This may involve changing the planning horizon or the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker