How To Fix GI241 - Transfer of planning data with over 53 periods not currently supported


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GI - FI-SL update

  • Message number: 241

  • Message text: Transfer of planning data with over 53 periods not currently supported

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GI241 - Transfer of planning data with over 53 periods not currently supported ?

    The SAP error message GI241, which states "Transfer of planning data with over 53 periods not currently supported," typically occurs in the context of planning and forecasting within SAP systems, particularly when using the SAP Integrated Business Planning (IBP) or SAP Advanced Planning and Optimization (APO) modules.

    Cause:

    The error arises when a planning run or data transfer is attempted with a time horizon that exceeds the maximum number of periods allowed for a single planning run. In many SAP systems, the limit is set to 53 periods (which could represent weeks, months, or any other time unit depending on the configuration). This limitation is often due to the underlying data model or the configuration settings in the planning application.

    Solution:

    To resolve this error, you can consider the following approaches:

    1. Reduce the Number of Periods: Adjust your planning run to include 53 periods or fewer. This may involve changing the planning horizon or the selection criteria for the data you are trying to transfer.

    2. Split the Planning Run: If you need to work with more than 53 periods, consider splitting your planning data into multiple runs. For example, you could run one planning cycle for the first 53 periods and another for the subsequent periods.

    3. Check Configuration Settings: Review the configuration settings in your SAP system to see if there are any parameters that can be adjusted to allow for more periods. This may involve consulting with your SAP Basis or technical team.

    4. Consult Documentation: Refer to the SAP documentation or help resources specific to the module you are using (e.g., SAP IBP or SAP APO) for any additional guidelines or best practices regarding planning data transfers.

    5. Contact SAP Support: If the issue persists or if you require further assistance, consider reaching out to SAP Support for help. They may provide insights specific to your system configuration or version.

    Related Information:

    • Planning Periods: Understand how planning periods are defined in your SAP system and how they relate to your business processes.
    • Data Transfer Methods: Familiarize yourself with the different methods of transferring planning data in SAP, such as using the planning book, data views, or integration with other systems.
    • Performance Considerations: Be aware that larger planning runs can impact system performance, so it's often advisable to keep planning cycles manageable.

    By following these steps, you should be able to address the GI241 error and successfully manage your planning data within the constraints of your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant