How To Fix GHO_NET089 - Validity of link from &1 to &2 is out of range of production dates


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_NET - Message class for Production Network Modelling

  • Message number: 089

  • Message text: Validity of link from &1 to &2 is out of range of production dates

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_NET089 - Validity of link from &1 to &2 is out of range of production dates ?

    The SAP error message GHO_NET089 indicates that there is a problem with the validity of a link (or relationship) between two objects (typically materials or production orders) in the context of production planning or scheduling. Specifically, it means that the link from one object (&1) to another (&2) is not valid because it falls outside the defined production dates.

    Cause:

    1. Date Mismatch: The production dates for the objects involved do not align. For example, the start or end date of the production order or the validity period of the material may not cover the dates of the link.
    2. Incorrect Configuration: The configuration settings for the production process or the materials may not be set correctly, leading to invalid links.
    3. Master Data Issues: There may be issues with the master data of the materials or production orders, such as incorrect validity periods or missing data.
    4. Changes in Production Schedule: If there have been recent changes to the production schedule or the dates of the involved objects, it may lead to this error.

    Solution:

    1. Check Production Dates: Verify the production dates for both objects involved in the link. Ensure that the dates are correctly set and that the link falls within the valid range.
    2. Adjust Validity Periods: If the validity periods of the materials or production orders are incorrect, adjust them to ensure they cover the necessary dates.
    3. Review Master Data: Check the master data for both objects to ensure that all necessary information is complete and accurate. This includes checking the validity periods and any other relevant settings.
    4. Recreate Links: If the links are invalid due to changes in the production schedule, consider recreating the links after ensuring that the dates are aligned.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the error and how to resolve it in your particular context.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like CO02 (Change Production Order) or MD04 (Stock/Requirements List) to check and adjust the relevant data.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional troubleshooting steps.
    • User Roles: Ensure that you have the necessary permissions to make changes to production orders or material master data.
    • Testing: After making adjustments, test the changes in a development or test environment before applying them to the production environment to avoid further issues.

    If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker