How To Fix GHO_NET081 - Links cannot be created between start and end nodes


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_NET - Message class for Production Network Modelling

  • Message number: 081

  • Message text: Links cannot be created between start and end nodes

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_NET081 - Links cannot be created between start and end nodes ?

    The SAP error message GHO_NET081, which states "Links cannot be created between start and end nodes," typically occurs in the context of SAP's project management or network planning functionalities, such as in the Project System (PS) or Production Planning (PP) modules. This error indicates that there is an issue with the way the nodes (activities or tasks) are being linked in a network diagram or project plan.

    Cause:

    1. Incorrect Node Type: The error often arises when trying to create a link between incompatible node types. For example, you may be trying to link a start node (which is usually the beginning of a process) directly to an end node (which signifies the completion of a process) without any intermediate activities.

    2. Missing Intermediate Activities: The linking logic in project management typically requires that there are intermediate activities between the start and end nodes. If there are no such activities, the system will not allow the creation of a direct link.

    3. Network Structure Issues: There may be structural issues in the network that violate the rules of how nodes can be connected. This could include circular dependencies or incorrect sequencing of tasks.

    4. Configuration Issues: Sometimes, the configuration settings in the SAP system may not allow certain types of links to be created due to business rules or constraints.

    Solution:

    1. Check Node Types: Ensure that you are linking compatible node types. Verify that you are not trying to link a start node directly to an end node without any intermediate activities.

    2. Add Intermediate Activities: If you need to link a start node to an end node, make sure to include the necessary intermediate activities in between. This will create a valid path for the link.

    3. Review Network Structure: Examine the overall structure of your network to ensure that it adheres to the required linking rules. Look for any circular dependencies or incorrect sequences that may be causing the issue.

    4. Consult Configuration Settings: If the problem persists, check the configuration settings in your SAP system. There may be specific rules or constraints that need to be adjusted to allow the creation of the desired links.

    5. Use Transaction Codes: Utilize relevant transaction codes (like CN22 for network maintenance) to review and modify the network structure as needed.

    6. Documentation and Help: Refer to SAP documentation or help resources for guidance on network planning and linking nodes. You may also consider reaching out to your SAP support team for assistance.

    Related Information:

    • SAP Notes: Check for any SAP Notes related to GHO_NET081 for additional insights or patches that may address the issue.
    • Training and Documentation: Familiarize yourself with SAP's project management and network planning functionalities through training materials or user guides.
    • Community Forums: Engage with SAP community forums or user groups where similar issues may have been discussed, and solutions shared.

    By following these steps, you should be able to resolve the GHO_NET081 error and successfully create the necessary links in your SAP project or network planning activities.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant