How To Fix GHO_NET066 - The time zones of Production Network &1(&2) and &3(&4) should be the same


GHO_NET066 - Overview

  • Message type: E = Error

  • Message class: GHO_NET - Message class for Production Network Modelling

  • Message number: 066

  • Message text: The time zones of Production Network &1(&2) and &3(&4) should be the same

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_NET066 - The time zones of Production Network &1(&2) and &3(&4) should be the same ?
    The SAP error message GHO_NET066 indicates a mismatch in time zones between two systems or components involved in a production network. This error typically arises in scenarios where there is a need for synchronization between different systems, such as when integrating multiple SAP systems or when using distributed systems.
    
    Cause: The error occurs when the time zones of the specified production network components do not match. This can happen in various situations, such as: When configuring a production network that involves multiple systems or servers located in different time zones. When there are discrepancies in the time zone settings of the SAP systems involved in the production network. When the time zone settings of the application server and the database server are not aligned.
    Solution: To resolve the GHO_NET066 error, you can follow these steps: Check Time Zone Settings: Verify the time zone settings of the involved systems. You can do this by checking the system parameters in the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author