How To Fix GHO_FDC_UI017 - Well test start and end dates cannot run on future dates


GHO_FDC_UI017 - Overview

  • Message type: E = Error

  • Message class: GHO_FDC_UI - FDC UI Messages

  • Message number: 017

  • Message text: Well test start and end dates cannot run on future dates

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FDC_UI017 - Well test start and end dates cannot run on future dates ?
    The SAP error message GHO_FDC_UI017 indicates that there is an issue with the well test start and end dates being set in the future. This error typically arises in the context of managing well tests in the SAP system, particularly in modules related to oil and gas operations.
    
    Cause: The primary cause of this error is that the system does not allow well tests to be scheduled with start or end dates that are beyond the current date. This restriction is often in place to ensure data integrity and to prevent scheduling conflicts or inaccuracies in reporting.
    Solution: To resolve this error, you can take the following steps: Check Dates: Review the start and end dates you have entered for the well test. Ensure that both dates are set to the current date or a past date. Adjust Dates: If the dates are indeed set in the future, modify them to reflect a valid time frame.

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author