How To Fix GHO_FC_RESULT022 - Upstream link of Network &1 not overlapping with Project/Network Eff Date


GHO_FC_RESULT022 - Overview

  • Message type: E = Error

  • Message class: GHO_FC_RESULT - Forecast result message Class

  • Message number: 022

  • Message text: Upstream link of Network &1 not overlapping with Project/Network Eff Date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_RESULT022 - Upstream link of Network &1 not overlapping with Project/Network Eff Date ?
    The SAP error message GHO_FC_RESULT022 indicates that there is an issue with the upstream link of a network in relation to the project or network's effective date. This typically occurs in the context of project management and network planning within SAP, particularly when dealing with project structures and scheduling.
    
    Cause: The error arises when the effective date of the project or network does not overlap with the dates of the upstream network activities. This can happen due to several reasons: Date Mismatch: The start or finish dates of the upstream network activities are outside the effective date range of the project or network. Incorrect Configuration: The project or network may have been configured incorrectly, leading to a mismatch in dates. Changes in Project Dates: If the project or network dates were changed after the upstream activities were created, this could lead to inconsistencies.
    Solution: To resolve this error, you can take the following steps: Check Effective Dates: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker