How To Fix GHO_FC_MANAGE_PROJ141 - Only leaf node can be selected


GHO_FC_MANAGE_PROJ141 - Overview

  • Message type: E = Error

  • Message class: GHO_FC_MANAGE_PROJ - Message class for Forecasting - Project Setup

  • Message number: 141

  • Message text: Only leaf node can be selected

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_MANAGE_PROJ141 - Only leaf node can be selected ?
    The SAP error message GHO_FC_MANAGE_PROJ141 with the description "Only leaf node can be selected" typically occurs in the context of project management or financial controlling within SAP. This error indicates that the system is expecting a selection of a "leaf node" in a hierarchical structure, such as a project structure or a cost center hierarchy, but the user has selected a node that has child nodes (i.e., a parent node).
    
    Cause: Hierarchical Structure: The selected node in the project or cost center hierarchy is not a leaf node. A leaf node is a terminal node that does not have any children. If you select a node that has child nodes, the system will throw this error. Incorrect Selection: Users may inadvertently select a parent node instead of a leaf node when trying to perform an action that requires a specific level of granularity.
    Solution: Select a Leaf Node: Ensure that you are selecting a leaf

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant