How To Fix GHO_FC_MANAGE_PROJ137 - Medium &1 does not exist for Network &2


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_FC_MANAGE_PROJ - Message class for Forecasting - Project Setup

  • Message number: 137

  • Message text: Medium &1 does not exist for Network &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_MANAGE_PROJ137 - Medium &1 does not exist for Network &2 ?

    The SAP error message GHO_FC_MANAGE_PROJ137 indicates that a specific medium (such as a resource, material, or document) does not exist for a given network in the project management module. This error typically arises in the context of project systems (PS) when trying to manage or assign resources to a project network.

    Cause:

    1. Missing Medium: The medium referenced in the error message is not defined in the system. This could be due to incorrect configuration or missing master data.
    2. Incorrect Network Assignment: The network number provided may not be correctly linked to the medium or may not exist in the system.
    3. Data Inconsistency: There may be inconsistencies in the data, such as missing entries in the relevant tables or incorrect settings in the project management configuration.

    Solution:

    1. Check Medium Configuration:

      • Verify that the medium (resource, material, etc.) exists in the system. You can do this by checking the relevant master data (e.g., resource master, material master).
      • If the medium does not exist, create it in the system.
    2. Validate Network Assignment:

      • Ensure that the network number referenced in the error message is valid and exists in the system.
      • Check if the network is correctly assigned to the project and that all necessary components are linked.
    3. Review Project Settings:

      • Check the project settings and configurations to ensure that all required fields are filled out correctly.
      • Make sure that the project and network are properly set up to use the medium in question.
    4. Data Consistency Check:

      • Run consistency checks in the project system to identify any discrepancies in the data.
      • Use transaction codes like CJ20N (Project Builder) to review the project structure and ensure all components are correctly linked.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific details related to the error message and its context.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting SAP Notes for any known issues related to this error.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CJI3 (Project Actual Line Items), and CJ02 (Change Project) for managing projects and networks.
    • SAP Notes: Search for SAP Notes related to GHO_FC_MANAGE_PROJ137 for any patches or updates that may address this issue.
    • User Roles: Ensure that you have the necessary authorizations to access and modify project and network data.

    By following these steps, you should be able to identify the cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker