How To Fix GHO_FC_MANAGE_PROJ076 - Authorization missing for create operation in Manage Project


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_FC_MANAGE_PROJ - Message class for Forecasting - Project Setup

  • Message number: 076

  • Message text: Authorization missing for create operation in Manage Project

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_MANAGE_PROJ076 - Authorization missing for create operation in Manage Project ?
    The SAP error message GHO_FC_MANAGE_PROJ076 indicates that a user is attempting to perform a create operation in the "Manage Project" application but lacks the necessary authorization. This is a common issue in SAP systems where user roles and authorizations are strictly controlled.
    
    Cause: The error is typically caused by one of the following reasons: Missing Authorization Object: The user does not have the required authorization object assigned to their role that allows them to create projects. Role Assignment: The user may not have the appropriate role assigned that includes the necessary permissions for project management. Authorization Profile: The authorization profile assigned to the user may not include the necessary permissions for the specific action they are trying to perform.
    Solution: To resolve this issue, you can follow these steps: Check User Roles: Go to transaction code SU01 (User Maintenance) and enter the user ID. Check the roles assigned to the user and ensure that they include the necessary permissions for

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author