How To Fix GHO_FC_MANAGE_PROJ053 - Network Medium is set to Delete with Network ID &1 and Medium &2


GHO_FC_MANAGE_PROJ053 - Overview

  • Message type: E = Error

  • Message class: GHO_FC_MANAGE_PROJ - Message class for Forecasting - Project Setup

  • Message number: 053

  • Message text: Network Medium is set to Delete with Network ID &1 and Medium &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_MANAGE_PROJ053 - Network Medium is set to Delete with Network ID &1 and Medium &2 ?
    The SAP error message GHO_FC_MANAGE_PROJ053 indicates that there is an issue with a network medium that is set to "Delete" for a specific network ID and medium. This typically occurs in the context of project management or network planning within SAP, particularly when dealing with project structures and their associated resources.
    
    Cause: The error is triggered when: A network medium (such as a resource or activity) is marked for deletion, but there are still dependencies or references to it that prevent it from being deleted. The system is trying to process or manage a project that includes this network medium, which is not allowed if it is flagged for deletion.
    Solution: To resolve this error, you can take the following steps: Check Network Medium Status: Go to the transaction code related to network management (e.g., CN21 for creating networks or CN22 for changing networks). Look for the network ID and medium mentioned in the error message. Verify if the medium

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author