How To Fix GHO_FC_MANAGE_PROJ049 - ScenarioÆs state does not allow I/U/D for Network


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_FC_MANAGE_PROJ - Message class for Forecasting - Project Setup

  • Message number: 049

  • Message text: ScenarioÆs state does not allow I/U/D for Network

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_MANAGE_PROJ049 - ScenarioÆs state does not allow I/U/D for Network ?
    The SAP error message GHO_FC_MANAGE_PROJ049 indicates that the scenario's state does not allow Insert, Update, or Delete (I/U/D) operations for a network. This typically occurs in the context of project management and network planning within SAP, particularly when dealing with project structures and their associated networks.
    
    Cause: Scenario State: The error usually arises when the project or network is in a state that does not permit modifications. This could be due to: The project being in a locked state. The network being in a status that restricts changes (e.g., completed, closed, or archived). The scenario being set to a read-only mode. Authorization Issues: The user may not have the necessary permissions to perform I/U/D operations on the network. Configuration Settings: Certain configuration settings in the project management module may restrict changes based on the project phase or status.
    Solution: Check Scenario Status: Verify the current status of the project or network. If it is in a locked or completed

    Already have an account? Login here!


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author