How To Fix GHO_FC_DIF100 - Capacity updated successfully


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_FC_DIF - Message class for DIF Forecasting

  • Message number: 100

  • Message text: Capacity updated successfully

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_FC_DIF100 - Capacity updated successfully ?

    The SAP error message "GHO_FC_DIF100 Capacity updated successfully" is not an error in the traditional sense, but rather an informational message indicating that the capacity has been updated successfully in the system. This message typically appears in the context of managing capacities in SAP, particularly in modules related to production planning, capacity planning, or project management.

    Cause:

    • The message is triggered when a process that updates capacity data (such as a capacity planning run, a manual update, or a batch job) has completed successfully. It indicates that the system has processed the capacity changes without any issues.

    Solution:

    Since this message is informational and indicates success, there is no specific solution required. However, if you are looking to ensure that the capacity updates are correct, you can take the following steps:

    1. Verify Capacity Data: Check the updated capacity data to ensure that it reflects the expected changes.
    2. Review Logs: If you are running a batch job or a process that updates capacity, review the logs to confirm that all steps were executed as intended.
    3. Monitor Performance: After the update, monitor the performance of the system or the specific processes that rely on the updated capacity to ensure they are functioning correctly.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes in SAP that deal with capacity planning, such as:
      • CM01: Capacity Overview
      • CM21: Capacity Planning
      • CM25: Capacity Evaluation
    • Documentation: Refer to SAP Help documentation for detailed information on capacity management and planning.
    • User Roles: Ensure that users involved in capacity planning have the appropriate roles and authorizations to make updates.

    If you encounter any issues or discrepancies after receiving this message, it may be worth investigating further into the specific processes or data involved.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant