Do you have any question about this error?
Message type: E = Error
Message class: GHO_ALLOC - Message class for Allocation
Message number: 010
Message text: Enter planned quantity for node &1 and UOM &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
GHO_ALLOC010
- Enter planned quantity for node &1 and UOM &2 ?The SAP error message GHO_ALLOC010 typically occurs in the context of the SAP Advanced Planning and Optimization (APO) module, particularly when dealing with allocation or planning processes. This error indicates that a planned quantity has not been entered for a specific node and unit of measure (UOM) in the planning process.
Cause:
- Missing Data: The most common cause of this error is that the planned quantity for a specific node (which could represent a product, location, or other planning object) has not been entered in the system.
- Incorrect Configuration: There may be issues with the configuration of the planning area or the master data that prevent the system from recognizing the planned quantity.
- Data Entry Error: Users may have overlooked entering the planned quantity during the planning process.
- Integration Issues: If the data is being pulled from another system or module, there may be integration issues that prevent the planned quantity from being populated.
Solution:
- Enter Planned Quantity: Navigate to the relevant planning transaction or screen and ensure that you enter the planned quantity for the specified node and UOM. This is often done in the planning book or through a specific planning transaction.
- Check Master Data: Verify that the master data for the product or node is correctly set up, including the UOM and any relevant planning parameters.
- Review Configuration: If the issue persists, review the configuration of the planning area and ensure that all necessary settings are correctly defined.
- Data Consistency Check: Run consistency checks in the system to identify any discrepancies in the data that may be causing the issue.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the planning area and the error message.
- Contact Support: If you are unable to resolve the issue, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
/SAPAPO/SDP94
for planning books or /SAPAPO/MC90
for planning area configuration.By following these steps, you should be able to identify the cause of the GHO_ALLOC010 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GHO_ALLOC009
Enter capacity quantity for node &1 and UOM &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_ALLOC008
Object links for network &1 not maintained for medium &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_ALLOC011
Network Object rule on &1 can't be validated without valid network rule
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GHO_ALLOC012
Node volume can't be validated without valid network objects
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.