How To Fix GHO_ALLOC003 - Enter capacity for node &1


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_ALLOC - Message class for Allocation

  • Message number: 003

  • Message text: Enter capacity for node &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_ALLOC003 - Enter capacity for node &1 ?

    The SAP error message GHO_ALLOC003 ("Enter capacity for node &1") typically occurs in the context of production planning or capacity planning within the SAP system. This error indicates that the system requires you to specify the capacity for a particular node (which could be a work center, production line, or any other resource) in the planning process.

    Cause:

    1. Missing Capacity Data: The most common cause of this error is that the capacity data for the specified node has not been maintained in the system. This could be due to:

      • The work center or resource not being set up correctly.
      • Capacity planning data not being entered for the specific node.
    2. Incorrect Configuration: There may be issues with the configuration of the planning parameters or the node itself, leading to the system not recognizing the available capacity.

    3. Data Inconsistencies: There could be inconsistencies in the data related to the node, such as missing or incorrect entries in the relevant tables.

    Solution:

    To resolve the GHO_ALLOC003 error, you can take the following steps:

    1. Check Work Center/Node Configuration:

      • Navigate to the work center or node in question and verify that it is correctly configured.
      • Ensure that the capacity data (e.g., available capacity, shift patterns) is properly maintained.
    2. Maintain Capacity Data:

      • Go to the transaction code CR01 (Create Work Center) or CR02 (Change Work Center) to enter or update the capacity details for the node.
      • Ensure that the capacity is defined for the relevant periods (daily, weekly, etc.).
    3. Review Planning Parameters:

      • Check the planning parameters associated with the node to ensure they are set correctly.
      • Make sure that the node is included in the relevant planning runs.
    4. Run Capacity Planning:

      • After making the necessary changes, run the capacity planning process again to see if the error persists.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific guidance on capacity planning and work center configuration.
    6. Seek Help from SAP Support:

      • If the issue persists after checking the above points, consider reaching out to SAP support or your internal SAP team for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CR01, CR02, CM01 (Capacity Planning), and CM21 (Capacity Leveling).
    • SAP Notes: Check for any SAP Notes related to capacity planning and the specific error message for additional insights or patches.
    • Training and Documentation: Consider reviewing training materials or documentation related to SAP Production Planning (PP) and Capacity Planning for a deeper understanding of the processes involved.

    By following these steps, you should be able to resolve the GHO_ALLOC003 error and ensure that the capacity for the specified node is correctly entered in the SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author