How To Fix GHO_ALLOC000 - Error in network structure: &1&2&3&4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: GHO_ALLOC - Message class for Allocation

  • Message number: 000

  • Message text: Error in network structure: &1&2&3&4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message GHO_ALLOC000 - Error in network structure: &1&2&3&4 ?
    The SAP error message GHO_ALLOC000, which indicates "Error in network structure: &1&2&3&4," typically arises in the context of project management or production planning when there is an issue with the network structure in the system. This error can occur during various operations, such as when trying to allocate resources or when processing a project network.
    Causes:
    
    Incorrect Network Structure: The network structure may be incorrectly defined, leading to inconsistencies in the relationships between activities.
    Missing Dependencies: There may be missing or incorrect dependencies between tasks or activities in the network.
    Invalid Dates: Activities may have invalid start or finish dates that do not align with the overall project timeline.
    Resource Allocation Issues: Problems with resource allocation, such as over-allocation or unavailability of resources, can trigger this error.
    
    Configuration Issues: There may be configuration issues in the project management or production planning modules. Solutions: Check Network Structure: Review the network structure for any inconsistencies. Ensure that all activities are

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker