Do you have any question about this error?
Message type: E = Error
Message class: GG - Messages for FI-SL customizing
Message number: 868
Message text: Integrated planning not active
Integrated planning for ledger &V1& - version &V2& company code &V3& -
is not active.
If you want to use integrated planning, supplement Customizing
(activate integrated planning or include entry for ledger &V1&
- version &V2& and then activate integrated planning).
<DS:TRAN.OBP6> Activate integrated planning </>
Error message extract from SAP system. Copyright SAP SE.
GG868
- Integrated planning not active ?The SAP error message GG868, which states "Integrated planning not active," typically occurs in the context of SAP Integrated Business Planning (IBP) or SAP BW (Business Warehouse) when a user attempts to execute a planning function or transaction that requires integrated planning functionality, but that functionality is not activated in the system.
Cause:
- Integrated Planning Not Activated: The most common cause of this error is that integrated planning has not been activated for the relevant InfoProvider or planning area.
- Configuration Issues: There may be configuration issues in the planning environment that prevent integrated planning from being utilized.
- Authorization Issues: The user may not have the necessary authorizations to access integrated planning features.
- Incorrect Planning Area: The planning area being used may not be set up correctly or may not support integrated planning.
Solution:
Activate Integrated Planning:
- Go to the relevant transaction (e.g., RSA1 for BW) and check the settings for the InfoProvider or planning area.
- Ensure that integrated planning is activated. This may involve setting specific flags or options in the configuration.
Check Configuration:
- Review the configuration settings for the planning area or InfoProvider to ensure that all necessary settings are correctly configured.
- Ensure that the planning functions and data flows are properly defined.
User Authorizations:
- Verify that the user has the necessary authorizations to access integrated planning features. This may involve checking roles and authorizations in the user profile.
Consult Documentation:
- Refer to SAP documentation or notes related to integrated planning for any specific steps or requirements that may need to be addressed.
System Logs:
- Check system logs for any additional error messages or warnings that may provide more context about the issue.
Contact SAP Support:
- If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the GG868 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GG867
Ledger &1: No integrated planning for company code &2
What causes this issue? With the current Customizing settings, no data will be posted through integrated planning in ledger &V1&. Your Custom...
GG866
Invalid table-ledger combination.
What causes this issue? The ledger &V1& does not correspond with table &V2&.System Response The system issues an error message and w...
GG869
Specify all fields for validation using a value table
What causes this issue? You have not specified all fields in the 'Validation via value table' block.System Response The system still needs...
GG870
Use exit &3 for domain &2
What causes this issue? You want to validate master data using a value table. However, the system has discovered that there is already a standard exi...
Click on this link to search all SAP messages.