Do you have any question about this error?
Message type: E = Error
Message class: GC - Error Messages for Consolidation/Extended General Ledger
Message number: 193
Message text: Preparation for profit center consolidation activated. See long text!
Profit center consolidation is only possible in EC-MC.
Marking "Profit Center consolidation" activates preparations for Profit
Center consolidation in the operational systems, even if FI-LC or
RF-KONS are given as the current consolidation system.
Error message extract from SAP system. Copyright SAP SE.
GC193
- Preparation for profit center consolidation activated. See long text! ?The SAP error message GC193, which states "Preparation for profit center consolidation activated," typically occurs in the context of profit center accounting and consolidation processes. This error indicates that the system is set up to perform profit center consolidation, but there may be issues with the configuration or data that need to be addressed.
Cause:
- Configuration Issues: The profit center accounting may not be properly configured. This could include missing settings in the controlling area or profit center settings.
- Data Inconsistencies: There may be inconsistencies in the data that are preventing the consolidation process from proceeding. This could include missing profit center assignments or incorrect data in the relevant tables.
- Activation Status: The error may indicate that the preparation for profit center consolidation has been activated, but the necessary prerequisites have not been met.
Solution:
Check Configuration:
- Ensure that the profit center accounting is correctly configured in the controlling area.
- Verify that all necessary settings for profit center consolidation are activated in the system.
- Check the settings in transaction code
OKKP
(Controlling Area) and ensure that the profit center is correctly assigned.Data Validation:
- Review the profit center assignments for all relevant documents and ensure that they are correctly assigned.
- Use transaction codes like
KE5Z
(Display Profit Center Document) to check for any inconsistencies in the data.- Run reports to identify any missing or incorrect profit center assignments.
Review Long Text:
- The error message may have a long text that provides additional details about the specific issue. You can view this by clicking on the message or using transaction code
SE91
to look up the message number and read the long text.Consult Documentation:
- Refer to SAP documentation or help notes related to profit center accounting and consolidation for further guidance on resolving the issue.
Contact Support:
- If the issue persists after checking the configuration and data, consider reaching out to SAP support or your internal SAP team for assistance.
Related Information:
OKKP
, KE5Z
, and KSB1
(for displaying line items).By following these steps, you should be able to identify and resolve the underlying cause of the GC193 error message in SAP.
Get instant SAP help. Start your 7-day free trial now.
GC192
Assignment made for realtime update to the cons.proc./cons.staging ledger
What causes this issue? The following assignments for updating are made:System Response Setup "Realtime Update": All company codes to whic...
GC191
No ledger for consolidation has been specified
What causes this issue? No consolidation staging ledger was allocated to the company code.System Response If an extract is to be created for consoli...
GC194
Realtime update in RF-KONS from SAP ERP is not possible
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GC195
TTy for differential item & required (elimination set &)
What causes this issue? The FS chart of accounts requires transaction type assignment, however no transaction type has been entered for this item in ...
Click on this link to search all SAP messages.