Do you have any question about this error?
Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now →
Message type: E = Error
Message class: GA - Allocations
Message number: 742
Message text: Reset: document & has other from-period
You have specified a document to be reset whose lower limit is &V2&.
You want to reset the document from period &V3&.
The reset is terminated.
Inform your system administrator. There is an error in the line item
data base.
Error message extract from SAP system. Copyright SAP SE.
GA742
- Reset: document & has other from-period ?The SAP error message GA742 "Reset: document & has other from-period" typically occurs in the context of financial accounting and controlling when you attempt to reset a document that is associated with a different posting period than the one currently being processed. This can happen during activities such as resetting a document in the General Ledger or during the closing process.
Cause:
- Posting Period Mismatch: The document you are trying to reset belongs to a different posting period than the one you are currently in. For example, if you are trying to reset a document from a previous fiscal year while you are in the current fiscal year, this error will occur.
- Document Status: The document may have been posted in a period that is now closed or restricted for changes.
- Configuration Issues: There may be configuration settings in the financial module that restrict certain actions based on the posting period.
Solution:
- Check Posting Period: Verify the posting period of the document you are trying to reset. You can do this by checking the document in the relevant transaction (e.g., FB03 for displaying documents).
- Open the Required Period: If you need to reset the document, you may need to open the posting period in the configuration settings (Transaction code OB52) to allow changes to be made.
- Use the Correct Period: Ensure that you are working in the correct posting period that corresponds to the document you are trying to reset.
- Consult with Finance Team: If you are unsure about changing posting periods or the implications of resetting documents, consult with your finance team or SAP administrator for guidance.
- Transaction Codes: Familiarize yourself with relevant transaction codes such as:
- OB52: To manage posting periods.
- FB03: To display documents.
- FB08: To reverse documents if applicable.
Related Information:
By following these steps, you should be able to resolve the GA742 error and proceed with your financial processes in SAP.
Get instant SAP help. Sign up for our Free Essentials Plan.
GA741
Unit cannot be standardized since target unit does not exist
What causes this issue? A problem occurred during conversion of unit &V2& in record &V1&. The original unit in the record could not b...
GA740
Unit cannot be converted, quantities set to 0
What causes this issue? During posting, unit of measure &V2& for cost element &V1&, used for internal calculation, is converted to th...
GA743
Reset: document & has other to-period
What causes this issue? You specified a document with an upper limit &V2& to be reset. However, you want to reset the document up to period &...
GA744
Reset: Document & does not exist
What causes this issue? Document &V1& in controlling area &V2& is to be reversed. However, this document is not in the data bank.Syst...
Click on this link to search all SAP messages.