Do you have any question about this error?
Message type: E = Error
Message class: GA - Allocations
Message number: 646
Message text: Sender &2/&1 invalid, because activity type &1 not planned on CCtr &2
You want to carry out a periodic reposting of activity-dependent costs
in fiscal year &V3& with sender &V2&/&V1&.
However, this requires that you created
activity type &V1& on cost center
&V2&. You do this when planning activity types.
Sender &V2&/&V1& is not accepted as a valid sender. The system does not
make a periodic reposting of this object.
If this receiver is to participate in periodic reposting, carry out
activity type planning for this object in fiscal year &V3& and version
&V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
GA646
- Sender &2/&1 invalid, because activity type &1 not planned on CCtr &2 ?The SAP error message GA646 indicates that there is an issue with the assignment of an activity type to a cost center (CCtr) in the context of controlling (CO) modules. Specifically, the error states that the activity type you are trying to use is not planned for the specified cost center.
Cause:
- Activity Type Not Planned: The primary cause of this error is that the specified activity type has not been planned for the given cost center in the system. This means that there is no allocation of that activity type to the cost center in the planning data.
- Incorrect Configuration: There may be a configuration issue where the activity type is not correctly assigned to the cost center in the controlling area.
- Data Entry Error: There could be a mistake in the data entry, such as using the wrong activity type or cost center.
Solution:
Check Planning Data:
- Go to the planning transaction (e.g., KP06 for cost center planning) and verify if the activity type is planned for the specified cost center.
- If it is not planned, you will need to enter the planning data for that activity type on the cost center.
Review Configuration:
- Check the configuration settings in the controlling area to ensure that the activity type is correctly assigned to the cost center.
- You can do this by navigating to the configuration settings in the SAP system (SPRO) and reviewing the settings under Controlling > Cost Center Accounting > Master Data > Activity Types.
Correct Data Entry:
- Ensure that the correct activity type and cost center are being used in your transaction. Double-check for any typos or incorrect selections.
Consult Documentation:
- If you are unsure about the planning process or configuration, refer to SAP documentation or consult with your SAP support team for guidance.
Related Information:
By following these steps, you should be able to resolve the GA646 error and ensure that the activity type is properly planned for the specified cost center.
Get instant SAP help. Start your 7-day free trial now.
GA645
Periodic reposting of activity-dep.costs only with CCtr/activity type
What causes this issue? You want to carry out a periodic reposting of activity-dependent costs. The only objects permitted as sender are those of cat...
GA644
End the updating of table T811U
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GA647
Cycle run group &1 for cycles in &2 not yet available
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
GA666
SAP trace: Table &1 was saved under key &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.