Message type: E = Error
Message class: GA - Allocations
Message number: 502
Message text: Cycle &, starting date &, has a different allocation type.
You can create cycles for the following allocation types:
Periodic reposting
Distribution
Assessment
Process assessment
Indirect activity allocation, Cost Center Accounting
Indirect activity allocation, Activity Based Costing
The cycle names must be defined separately for each allocation type.
Cycle &V1&, starting date &v2& is of a different allocation type than
the transaction you chose.
The cycle cannot be processed.
Check the name of the cycle or choose the correct transaction.
Error message extract from SAP system. Copyright SAP SE.
GA502
- Cycle &, starting date &, has a different allocation type. ?The SAP error message GA502 indicates that there is a mismatch in the allocation type for a cycle in the context of a planning or allocation process. This error typically arises in the context of SAP Controlling (CO) or SAP Project System (PS) when trying to execute a cycle that has been defined with a specific allocation type, but the data or parameters being used do not match that allocation type.
Cause:
- Mismatch in Allocation Types: The cycle you are trying to execute has been defined with a specific allocation type (e.g., assessment, distribution), but the data or parameters being used do not conform to this allocation type.
- Incorrect Configuration: The configuration of the cycle or the master data (cost centers, internal orders, etc.) may not be set up correctly.
- Data Inconsistencies: There may be inconsistencies in the data being processed, such as missing or incorrect allocation structures.
Solution:
Check Cycle Configuration: Review the configuration of the cycle in the SAP system. Ensure that the allocation type defined for the cycle matches the data being processed.
- Go to the cycle definition in the SAP system (Transaction code: KSV1 for assessment cycles or KSV2 for distribution cycles) and verify the allocation type.
Review Master Data: Ensure that the master data (cost centers, internal orders, etc.) involved in the cycle is correctly set up and matches the expected allocation types.
- Check the allocation structure and ensure that all relevant objects are correctly assigned.
Data Consistency Check: Run consistency checks on the data being used in the cycle. Look for any missing or incorrect entries that could lead to this error.
- You can use transaction codes like KAH1 (for cost centers) to check the allocation structure.
Adjust Parameters: If you are executing the cycle with specific parameters, ensure that these parameters are appropriate for the allocation type defined in the cycle.
Consult Documentation: If the issue persists, refer to SAP documentation or consult with your SAP support team for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the GA502 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
GA501
Cycle & starting date & has not been created
What causes this issue? No cycle exists with the name &V1& and starting date &V2&.System Response This cycle cannot be processed.How...
GA445
Field RVERS may only be used for plan values (&1)
What causes this issue? While checking the allocation field usage, the system found invalid use of the field RVERS in the segment &V1&. The f...
GA503
Cycle &, starting date & has other actual/planned indicator
What causes this issue? You can create two different types of cycle: Plan cycles Actual cycles These cycles are maintained and processed using separa...
GA504
Cycle & has not been created
What causes this issue? No cycle exists with the name &V1&.System Response This cycle cannot be processed.How to fix this error? Choose ano...