How To Fix G5175 - Substitute cost object for venture & equity group & should be entered.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: G5 - IS-Oil /Joint Venture/ Material transfer pricing

  • Message number: 175

  • Message text: Substitute cost object for venture & equity group & should be entered.

  • Show details Hide details
  • Substitute cost object is needed while the system is posting user
    currency, or performing document split. The system will use substitute
    cost object to derive the venture for that document so that the whole
    document contains the same venture / equity group. This prevents
    inter-venture posting to occur while running bank switching.
    To create/change substitute cost object, go to:
    Joint Venture Processing -> Master Data -> Joint Venture -> Change
    Equity Groups -> select one of the equity group -> press Substitute
    cost object

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message G5175 - Substitute cost object for venture & equity group & should be entered. ?

    The SAP error message G5175 indicates that there is an issue with the cost object assignment in the context of venture and equity groups. This error typically arises when a cost object (such as a cost center, internal order, or project) is not properly assigned or is missing in the transaction you are trying to execute.

    Cause:

    1. Missing Cost Object: The cost object required for the transaction is not specified or is missing in the system.
    2. Incorrect Configuration: The configuration for the venture and equity group may not be set up correctly, leading to the system not recognizing the cost object.
    3. Data Entry Error: There may be a mistake in the data entry where the cost object should have been specified.
    4. Authorization Issues: The user may not have the necessary permissions to access or assign the cost object.

    Solution:

    1. Check Cost Object Assignment: Ensure that the cost object is correctly assigned in the transaction. You may need to enter the appropriate cost center, internal order, or project number.
    2. Review Configuration: Verify the configuration settings for the venture and equity group in the SAP system. Ensure that all necessary parameters are set up correctly.
    3. Data Entry Verification: Double-check the data you are entering to ensure that all required fields are filled out correctly, including the cost object.
    4. User Authorization: Confirm that the user has the necessary authorizations to access and assign the cost object. If not, contact your SAP security administrator to grant the required permissions.
    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the venture and equity group setup and cost object assignments.

    Related Information:

    • Transaction Codes: Depending on the context, you may be using transaction codes like CJ20N (Project Builder), KO01 (Create Internal Order), or others related to cost object management.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error message or provide additional troubleshooting steps.
    • Support: If the issue persists after trying the above solutions, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    By following these steps, you should be able to resolve the G5175 error and successfully complete your transaction in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker