Message text: Cons unit &2 is not assigned to cons group &1
As the global parameter of consolidation group <ZH>&V1&</>, you have
entered consolidation unit <ZH>&V2&</>. Though for the further global
parameters dimension, version, year and period, consolidation unit
<ZH>&V2&</> is not assigned to consolidation group <ZH>&V1&</>.
THis is a warning message.
You can continue with the processing, if you want to use this parameter
nevertheless. However bear in mind that the globally set consolidation
group and the globally set consolidation unit will be used
automatically and/or used as the default value for different functions.
This can lead to an error message in the further processing of the
function.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
G01251
- Cons unit &2 is not assigned to cons group &1 ?The SAP error message G01251 indicates that a consumption unit (cons unit) is not assigned to a consumption group (cons group). This error typically arises in the context of inventory management or production planning when the system expects a certain consumption unit to be linked to a specific consumption group for processing transactions.
Cause:
- Missing Assignment: The consumption unit (e.g., a specific material or batch) has not been assigned to the specified consumption group in the system.
- Configuration Issues: There may be configuration issues in the material master or the consumption group settings.
- Data Inconsistencies: There could be inconsistencies in the data, such as changes made to the consumption group or unit that were not properly updated in the system.
Solution:
Check Assignment:
- Go to the relevant transaction (e.g., MM02 for material master) and check if the consumption unit is assigned to the correct consumption group.
- If it is not assigned, you will need to assign it appropriately.
Update Material Master:
- If the consumption unit needs to be linked to a different consumption group, update the material master data accordingly.
- Ensure that the relevant views (like Basic Data, Sales, and Plant Data) are correctly maintained.
Review Configuration:
- Check the configuration settings for consumption groups in the system. This can usually be done in the SPRO transaction under the relevant logistics area.
- Ensure that the consumption group is correctly defined and that all necessary settings are in place.
Data Consistency Check:
- Run any necessary data consistency checks to ensure that there are no discrepancies in the master data.
- Use transaction codes like SE16 or SE11 to view the relevant tables and verify the data.
Consult Documentation:
- Refer to SAP documentation or help resources for specific guidance on managing consumption units and groups.
Contact Support:
- If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to resolve the G01251 error and ensure that your consumption units are correctly assigned to their respective consumption groups.
Get instant SAP help. Start your 7-day free trial now.
G01250
*- Verification dialog box global data ---------------------------------*
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
G01208
Error during generation
What causes this issue? An error occurred during the generation of DDIC objects.System Response The system issues an error message and will not allo...
G01252
From year for new group reporting logic is too early
What causes this issue? You have specified the fiscal year &V1& for the <LS> from year for new group logic</>. The <LS>year...
G01253
From year for new group reporting logic is not possible
What causes this issue? You have specified the fiscal year &V1& for the <LS> from year for new group logic</>. However, the <L...
Click on this link to search all SAP messages.