Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix G00575 - Source task &1 not yet blocked in version &2 with &3 in period &4


SAP Error Message - Details

  • Message type: E = Error

  • Message class: G00 - SAP Consolidation

  • Message number: 575

  • Message text: Source task &1 not yet blocked in version &2 with &3 in period &4

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message G00575 - Source task &1 not yet blocked in version &2 with &3 in period &4 ?

    The SAP error message G00575 indicates that there is an issue with a source task that has not yet been blocked in a specific version and period. This error typically arises in the context of project management or production planning within SAP, particularly when dealing with tasks that are part of a project or production order.

    Cause:

    1. Unblocked Source Task: The source task referenced in the error message has not been blocked for the specified version. This means that the system is trying to perform an operation on a task that is still open or active.
    2. Versioning Issues: The version specified in the error message may not be correctly set up or may not have the necessary configurations to allow the operation.
    3. Period Restrictions: The period specified may not allow for changes or operations on the task, possibly due to settings in the project or production planning configuration.

    Solution:

    1. Block the Source Task: Navigate to the relevant transaction (such as CJ20N for project management or CO02 for production orders) and manually block the source task. This will prevent any further changes or operations on it until it is unblocked.
    2. Check Version Settings: Ensure that the version specified in the error message is correctly configured. You may need to review the version settings in the project or production order to ensure they are set up correctly.
    3. Review Period Settings: Check the period settings in the project or production planning configuration. Ensure that the period allows for the operations you are trying to perform.
    4. Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling this error in the context of your specific module (e.g., Project System, Production Planning).
    5. Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP support for further assistance. They may provide insights based on the specific configuration and setup of your SAP environment.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder), CO02 (Change Production Order), or others depending on your specific context.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide additional context or solutions.
    • User Authorization: Ensure that you have the necessary authorizations to block tasks or make changes to the project or production order.

    By following these steps, you should be able to resolve the G00575 error and continue with your operations in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author