How To Fix FTR_COMS068 - Currency &1 must be assigned to a calendar


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FTR_COMS -

  • Message number: 068

  • Message text: Currency &1 must be assigned to a calendar

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FTR_COMS068 - Currency &1 must be assigned to a calendar ?
    The SAP error message FTR_COMS068 indicates that a specific currency (denoted by &1) is not assigned to a calendar in the system. This error typically arises in the context of financial transactions, particularly in the area of treasury and risk management, where currencies need to be linked to specific calendars for proper processing of financial instruments.
    
    Cause: The primary cause of this error is that the currency in question has not been configured in the system to be associated with a specific calendar. This can happen if: The currency is newly added and has not been assigned to any calendar. There was a change in the configuration that removed the currency from its calendar assignment. The calendar itself is not properly set up or is inactive.
    Solution: To resolve the error, you need to assign the currency to a calendar. Here are the steps to do this: Access the Configuration: Go to the SAP Easy Access screen. Navigate to the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker