How To Fix FSH_PP_ORD252 - Enter a different plant or alternate BOM in source and destination.


FSH_PP_ORD252 - Overview

  • Message type: E = Error

  • Message class: FSH_PP_ORD - Messages related Master PldOrd & Master ProdOrd

  • Message number: 252

  • Message text: Enter a different plant or alternate BOM in source and destination.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FSH_PP_ORD252 - Enter a different plant or alternate BOM in source and destination. ?
    The SAP error message FSH_PP_ORD252 typically occurs in the context of production planning and order processing, particularly when dealing with Bill of Materials (BOM) and plant-specific configurations. This error indicates that there is a mismatch between the source and destination plants or the BOMs being used in a production order or related transaction.
    
    Cause: Plant Mismatch: The source and destination plants specified in the production order or transaction do not match. Each plant may have its own BOM, and if the BOM for the source plant is not compatible with the destination plant, this error will occur. BOM Configuration: The BOM used in the source plant may not be available or valid for the destination plant. This can happen if the BOM is plant-specific and has not been created for the destination plant. Material Master Data: The material master data for the materials involved may not be correctly set up for the plants in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author