Message type: E = Error
Message class: FSH_PP_ORD - Messages related Master PldOrd & Master ProdOrd
Message number: 035
Message text: Creation of new planned order is not possible
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
FSH_PP_ORD035
- Creation of new planned order is not possible ?The SAP error message FSH_PP_ORD035 indicates that the creation of a new planned order is not possible due to certain conditions not being met. This error typically arises in the context of production planning and can be related to various factors. Here are some common causes, potential solutions, and related information: Causes: Material Availability: The material required for the planned order may not be available or may not have sufficient stock. Planning Parameters: The planning parameters for the material might not be set correctly, such as the lot size, lead time, or production version. Capacity Constraints: There may be capacity constraints in the production resources (work centers) that prevent the creation of new planned orders. Date Issues: The dates for the planned order may fall outside of the permissible range defined in the system. Status of the Material: The material might be in a status that does not allow for planning, such as being marked for
Get instant SAP help. Sign up for our Free Essentials Plan.
FSH_PP_ORD034
You can't increase the target quantity for planned orders
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
FSH_PP_ORD033
Order numbers do not belong to the generic material &1
What causes this issue? The specified order number(s) do not belong to the same generic material.System Response The system issues an error message ...
FSH_PP_ORD036
Master order &1 does not exist
What causes this issue? The specified master order number does not exist in the system.System Response The system issues an error message and will n...
FSH_PP_ORD037
Order &1 does not belong to master order &2
What causes this issue? The specified order number does not belong to the master order when you are unassigning planned order or production order fro...
Click on this link to search all SAP messages.