FSH_DEM_PIR103 - Overview

  • Message type: E = Error

  • Message class: FSH_DEM_PIR - Fashion specific Planned Independent Requirements

  • Message number: 103

  • Message text: New working date &2 is determined for requirement date &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


FSH_DEM_PIR103 - Details

  • The SAP error message FSH_DEM_PIR103 indicates that a new working date has been determined for a requirement date. This typically occurs in the context of demand management or planning processes within SAP, particularly in the Fashion Management module (FSH).
    
    Cause: The error message is triggered when the system recalculates the working date for a planned independent requirement (PIR) based on the current settings or parameters. This can happen due to several reasons, including: Calendar Settings: The working calendar may have been changed, affecting the availability of working days. Lead Times: Changes in lead times or production times can lead to a shift in the requirement date. Planning Parameters: Adjustments in planning parameters or settings in the demand management module can cause the system to recalculate dates. Material Availability: If there are changes in material availability or stock levels, the system may adjust the requirement dates accordingly.
    Solution: To resolve the issue, consider the following steps: Check Calendar Settings: Verify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


FSH_DEM_PIR103 - Related SAP Errors

Click on this link to search all SAP messages.