How To Fix FSCAL_UPL033 - Loading working days on the weekends (test run)


FSCAL_UPL033 - Overview

  • Message type: E = Error

  • Message class: FSCAL_UPL - Calendar Upload

  • Message number: 033

  • Message text: Loading working days on the weekends (test run)

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FSCAL_UPL033 - Loading working days on the weekends (test run) ?
    The SAP error message FSCAL_UPL033 indicates that there is an issue with loading working days that fall on weekends during a test run. This error typically arises in the context of planning or scheduling activities where the system is trying to allocate working days but encounters weekends, which are generally not considered working days.
    
    Cause: Calendar Configuration: The error often stems from the configuration of the factory calendar or work schedule. If the system is set to consider weekends as working days, it can lead to inconsistencies. Test Run Settings: The test run may be configured to include weekends, which is not aligned with the working day definitions in the system. Data Input Issues: Incorrect or incomplete data input regarding working days and weekends can also trigger this error.
    Solution: Check Calendar Settings: Go to the transaction code SCAL to review the factory calendar settings. Ensure that weekends are correctly defined as non-working days in the calendar. Adjust Test

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker