How To Fix FRE422 - Material &1 distribution centre &2 is not listed in analysis horizon.


SAP Error Message - Details

  • Message type: E = Error

  • Message class: FRE - F&R CON R/3 - Messages

  • Message number: 422

  • Message text: Material &1 distribution centre &2 is not listed in analysis horizon.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FRE422 - Material &1 distribution centre &2 is not listed in analysis horizon. ?

    The SAP error message FRE422 indicates that a specific material (denoted as &1) in a distribution center (denoted as &2) is not included in the analysis horizon for the forecast. This typically occurs in the context of demand planning or forecasting within SAP's Advanced Planning and Optimization (APO) module or similar functionalities.

    Cause:

    1. Analysis Horizon Configuration: The analysis horizon defines the time frame for which data is considered for forecasting. If the material and distribution center combination is not included in this horizon, the system will throw this error.
    2. Material Master Data: The material may not be properly set up in the system, or it may not be assigned to the correct distribution center.
    3. Forecasting Settings: The settings for the forecasting model may not include the specific material or distribution center.
    4. Data Availability: There may not be sufficient historical data for the material in the specified distribution center, leading to it being excluded from the analysis horizon.

    Solution:

    1. Check Analysis Horizon Settings:

      • Navigate to the configuration settings for the analysis horizon in the SAP system.
      • Ensure that the material and distribution center are included in the analysis horizon for the relevant planning area.
    2. Review Material Master Data:

      • Verify that the material is correctly set up in the material master.
      • Ensure that the distribution center is correctly assigned to the material.
    3. Adjust Forecasting Settings:

      • Check the forecasting model settings to ensure that the material and distribution center are included.
      • If necessary, adjust the settings to include the required combinations.
    4. Data Availability Check:

      • Ensure that there is sufficient historical data for the material in the distribution center.
      • If there is insufficient data, consider extending the analysis horizon or using a different forecasting method.
    5. Consult Documentation:

      • Refer to SAP documentation or help resources for specific configuration steps related to the analysis horizon and forecasting.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like /SAPAPO/SDP94 (for demand planning) or /SAPAPO/MC90 (for planning book settings) to check and modify settings.
    • SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide additional guidance.
    • User Roles and Authorizations: Ensure that you have the necessary authorizations to make changes to the analysis horizon and material master data.

    By following these steps, you should be able to resolve the FRE422 error and ensure that the material and distribution center are properly included in the analysis horizon for forecasting purposes.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker