How To Fix FPB_VP_EXP_PLANNING113 - Dates have been changes


FPB_VP_EXP_PLANNING113 - Overview

  • Message type: E = Error

  • Message class: FPB_VP_EXP_PLANNING - Messages for Express Planning

  • Message number: 113

  • Message text: Dates have been changes

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FPB_VP_EXP_PLANNING113 - Dates have been changes ?
    The SAP error message FPB_VP_EXP_PLANNING113 typically indicates that there are inconsistencies or changes in the dates related to planning data in the SAP system. This error can occur in various contexts, such as during planning runs, data uploads, or when executing planning functions.
    
    Cause: Date Changes: The error suggests that the dates for planning data have been modified after the planning process has started. This can happen if: The planning period has been adjusted. The planning data has been updated or changed by another user or process. There are discrepancies between the master data and the planning data. Data Locking: If multiple users are trying to access or modify the same planning data simultaneously, it can lead to conflicts and inconsistencies.
    Configuration Issues: Incorrect configuration in the planning settings or master data can also lead to this error.
    Solution: Check Date Consistency: Verify that the dates in the planning data are consistent with the master data. Ensure that no

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author