How To Fix FOPC_UI084 - Requested end date for ad hoc start not compatible with scheduled date


FOPC_UI084 - Overview

  • Message type: E = Error

  • Message class: FOPC_UI - Messages from the MIC-UI

  • Message number: 084

  • Message text: Requested end date for ad hoc start not compatible with scheduled date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message FOPC_UI084 - Requested end date for ad hoc start not compatible with scheduled date ?
    The SAP error message FOPC_UI084 indicates that there is a conflict between the requested end date for an ad hoc operation and the scheduled date of a related task or process. This error typically arises in the context of SAP's Financial Operations or Project Management modules, where scheduling and timing of tasks are critical.
    
    Cause: Date Mismatch: The end date you are trying to set for an ad hoc operation does not align with the scheduled dates of existing tasks or processes. This could be due to: The end date being earlier than the scheduled start date of a related task. The end date being later than the scheduled end date of a related task.
    Configuration Issues: There may be configuration settings in the system that enforce strict date compatibility rules, which are being violated. Data Entry Errors: Mistakes in entering dates, such as typos or incorrect formats, can lead to this error.
    Solution: Check Dates: Review the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker